Work out how much concrete you need for slabs, footings, walls, columns, tubes and steps, in cubic yards, cubic feet or cubic metres, with premixed bag counts.
Bag counts use typical yields for premixed concrete: 0.30 ft³ per 40 lb bag, 0.45 ft³ per 60 lb bag and 0.60 ft³ per 80 lb bag (about 0.0094 m³ per 20 kg and 0.0117 m³ per 25 kg). Check the yield printed on your bags. Weight assumes about 2,400 kg/m³ (150 lb/ft³).
The concrete calculator works out how much concrete you need for a slab, footing, wall, round column, tube or set of steps, in cubic yards, cubic feet and cubic metres, and how many bags of premixed concrete that equals. A 12 ft by 10 ft patio slab 4 inches thick needs 40 cubic feet, or about 1.48 cubic yards, of concrete. With a 10% allowance for waste, that’s 1.63 cubic yards, or 74 bags of 80 lb premix.
Ordering the right amount matters. Run short partway through a pour and you risk a weak joint where fresh concrete meets concrete that has already started to set. Order far too much and you pay for material you can’t use. The calculator gives a sensible order quantity in seconds.
Volume = length × width × thickness, with all three in the same unit. The most common mistake is forgetting that thickness is usually measured in inches while length and width are in feet. A 4-inch slab is 4 ÷ 12 = 0.333 feet thick.
For a 12 ft × 10 ft slab 4 inches thick: 12 × 10 × 0.333 = 40 cubic feet. There are 27 cubic feet in a cubic yard (3 ft × 3 ft × 3 ft), so 40 ÷ 27 = 1.48 cubic yards. In metric, a 5 m × 4 m slab 10 cm thick is 5 × 4 × 0.1 = 2 cubic metres.
Volume = π × (diameter ÷ 2)² × height. A hole 12 inches across and 4 feet deep holds π × 0.5² × 4 = 3.14 cubic feet. Six of them need 18.85 cubic feet, or about 0.70 cubic yards. If a post will stand in the hole, you can subtract the post’s volume, but many builders leave it in as part of the waste allowance.
Volume = π × (outer diameter² − inner diameter²) ÷ 4 × height. A ring 24 inches across on the outside and 18 inches on the inside, 3 feet tall, needs about 4.12 cubic feet.
Solid steps are built up from blocks: the first step is one rise high, the second two rises, and so on. The total volume is width × tread depth × rise × steps × (steps + 1) ÷ 2. Four steps 3 ft wide, with 7-inch rises and 11-inch treads, need 3 × 0.917 × 0.583 × 10 = about 16.04 cubic feet, or 0.59 cubic yards. This assumes the steps are solid and sit on the ground; steps built over a sloping base or with a landing need extra.
Split any awkward shape into rectangles and circles, work out each part separately and add them together. An L-shaped patio made of a 20 × 10 ft section and a 10 × 8 ft section, both 4 inches thick, covers 200 + 80 = 280 square feet. At 0.333 feet thick that’s 93.3 cubic feet, or about 3.46 cubic yards before waste. For a curved edge, treat it as part of a circle or measure the widest points and round up. For a slab with a thickened edge, calculate the edge beam as a separate strip and add it to the main slab.
Premixed concrete in bags is convenient for small jobs. You add water and mix in a wheelbarrow or a small mixer. Typical yields are:
| Bag size | Approximate yield | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 ft³ | 90 |
| 60 lb | 0.45 ft³ | 60 |
| 80 lb | 0.60 ft³ | 45 |
| 20 kg | 0.0094 m³ | about 107 per m³ |
| 25 kg | 0.0117 m³ | about 86 per m³ |
Yields vary between brands and mixes, so check the figure printed on the bag. For anything over about 1 cubic yard (roughly 0.75 m³), ready-mixed concrete delivered by truck is usually cheaper, faster and more consistent than mixing 45 or more heavy bags by hand. Many suppliers have a minimum order or charge a short-load fee for small deliveries, so compare both options.
These are common starting points, not engineering advice. For structural work, follow your local building code or an engineer’s specification.
Normal-weight concrete weighs about 2,400 kg per cubic metre, or roughly 150 lb per cubic foot, which is around 4,000 lb (about 2 short tons) per cubic yard. The 1.48 cubic yard patio slab above weighs about 2,700 kg, or roughly 6,000 lb. That’s worth knowing before you plan to carry bags across a garden, load a trailer or pour onto a suspended surface.
The calculator shows every result in cubic yards, cubic feet and cubic metres, so you can order in whatever unit your supplier uses.
You may also find the stair calculator useful to work out step count, riser height and stringer length, while the mulch calculator lets you work out how much mulch you need.
Multiply length × width × thickness in feet to get cubic feet, then divide by 27 for cubic yards. Add 5 to 10% for waste. A 12 × 10 ft slab 4 inches thick needs 40 ft³, or 1.48 yd³.
About 45 bags, since each 80 lb bag yields roughly 0.6 cubic feet and a cubic yard is 27 cubic feet.
It depends on the hole. A hole 10 inches across and 3 feet deep holds about 1.64 cubic feet, which is 4 bags of 60 lb premix at 0.45 ft³ per bag.
At 4 inches thick, a 10 × 10 ft slab needs 33.3 cubic feet, or about 1.23 cubic yards, before waste.
Most people add 5 to 10%. Use more, up to 15%, on uneven ground or for irregular shapes.
4 inches (10 cm) is standard for patios, paths and sidewalks. Driveways are usually 4 to 6 inches, depending on the vehicles using them.
Roughly 4,000 lb, or about 1,800 kg. A cubic metre weighs about 2,400 kg.
Bags suit small jobs under about 1 cubic yard. For larger pours, ready-mix delivered by truck is usually cheaper, quicker and more consistent.
Divide by 27. For example, 54 cubic feet is 2 cubic yards.
It's usually firm enough to walk on in a day or two and to drive on after about a week, and it reaches most of its design strength after about 28 days.
Yes. Choose Metres and centimetres and the calculator works in cubic metres, with 20 kg and 25 kg bag counts.